Work continues through the holidays to restore power to Cidra
The U.S. Army Corps of Engineers Task Force Power Restoration continues their mission through the holidays. Corps Quality Assurance Specialist Amy Tillery observes as a contracted crew from Mas-Tec persist with a stubborn pole anchor and guy, while working to straighten a recently placed power pole Christmas morning. The previous pole along with most others in the area had either been broken or toppled by Hurricane Irma and Maria. Residences and businesses in the area have been without power for over 100 days.

Download Image: Full Size (4 MB)
Photo by: Jerry Rogers |  VIRIN: 171225-A-HS946-108.JPG