Port Everglades Feasibility Report Released
The Port Everglades Harbor Feasibility Study was initiated in 2001 with the non-Federal sponsor, Broward County. The existing Federal Channel project depth of 42-feet does not provide adequate, safe depth for large tankers and container ships currently visiting the harbor. The report was released on June 28. For more information, go to http://1.usa.gov/11NqB5C

Download Image: Full Size (0.04 MB)
Tags:
Photo by: Jacksonville District |  VIRIN: 130628-A-CE999-025.JPG