Public Affairs Specialist
Sgt. Mike Greenwalt, A. Co. 249th Engineer Battalion “Prime Power” ensures all power is discharged from the generator before continuing work on the generator. The generator was installed at the Barceloneta Water Treatment Plant which provides water to a large number of factories in the area. With power restored, factory workers will be able to return to work. (USACE Photo by Mike A. Glasch)

Download Image: Full Size (0.27 MB)
Tags: 249th
Photo by: Mike A. Glasch |  VIRIN: 160722-A-CE999-467.JPG